|
|
|
And from the outside.
|
|
|
|
Finished bulkheads from inside...
|
|
|
|
Cleaned-up hole
|
|
|
|
The core
|
|
|
|
Hole complete, from below
|
|
|
|
|
Nearly finished (leaking on right)
|
|
|
|
Nearly finished
|
|
|
|
Farther along
|
|
|
|
Approximately half finished
|
|
|
|
A look at the process under weigh
|
|
|
|
|
which lubricated and cools during drilling.
|
|
|
|
to set up a reservoir for water...
|
|
|
|
to seal the "washer" to the tank...
|
|
|
|
I use toilet ring wax...
|
|
|
|
Protecting the tank against debris
|
|
|
|
|
Reef 2 in position for drilling
|
|
|
|
Drill press and messy work area (not required)
|
|
|
|
Ready to receive the tank for drilling...
|
|
|
|
Another view before unloading...
|
|
|
|
Just arrived...
|
|
|
|
|
Documenting Minor Existing Damage
|
|
|
|
Documenting Minor Existing Damage
|
|
|
|
Documenting Minor Existing Damage
|
|
|